23-Aug-2000 7:57:27 ISO REQUESTS ASTORIA_GT_12 OUT OF MERIT ABOVE OPCAP DMNC TEST. REQUESTED BY GEN OWNER AT 08:00 08/23/00
23-Aug-2000 9:00:31 ISO REQUESTS POLETTI____ OUT OF MERIT FOR ISO SECURITY. 72 LINE OUTAGE AT 09:00 08/23/00
23-Aug-2000 9:04:12 NYISO Locational based curtailment cut 500 MWs
23-Aug-2000 9:11:21 NYISO Locational based curtailment cut 300 MWs
23-Aug-2000 9:24:06 NYISO Locational based curtailment cut 400 MWs
23-Aug-2000 9:39:09 TP-CE REQUESTS VARIOUS ASTORIA, GOWANUS AND RAVENSWOOD GTs OUT OF MERIT FOR LOCAL SECURITY. 72 LINE OUTAGE, CON ED AT MAX GEN AT 08:55 08/23/00
23-Aug-2000 9:42:47 TP-CE REQUESTS NARROWS GTs OUT OF MERIT FOR LOCAL SECURITY. 72 LINE OUTAGE, CON ED AT MAX GEN AT 09:00 08/23/00
23-Aug-2000 10:11:09 ISO REQUESTS POLETTI____ NO LONGER OUT OF MERIT. AT 09:13 08/23/00
23-Aug-2000 10:27:57 TP-LI REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT FOR LOCAL SECURITY. EAST END LOAD AT 10:20 08/23/00
23-Aug-2000 10:35:00 TP-CE REQUESTS ASTORIA BUILDINGS 2&3 NO LONGER OUT OF MERIT. AT 10:07 08/23/00
23-Aug-2000 10:36:14 TP-CE REQUESTS GOWANUS_GT 1_GRP NO LONGER OUT OF MERIT. AT 10:09 08/23/00
23-Aug-2000 10:36:46 TP-CE REQUESTS GOWANUS_GT 4_GRP NO LONGER OUT OF MERIT. AT 10:20 08/23/00
23-Aug-2000 10:37:34 TP-CE REQUESTS ASTORIA_GT4 GROUP NO LONGER OUT OF MERIT. AT 10:24 08/23/00
23-Aug-2000 10:38:07 TP-CE REQUESTS GOWANUS_GT 2_GRP NO LONGER OUT OF MERIT. AT 10:25 08/23/00
23-Aug-2000 10:39:04 TP-CE REQUESTS RAVENSWOOD GROUPS 1&2 NO LONGER OUT OF MERIT. AT 10:26 08/23/00
23-Aug-2000 10:39:51 TP-CE REQUESTS ASTORIA_GT_8 NO LONGER OUT OF MERIT. AT 10:33 08/23/00
23-Aug-2000 11:20:15 ISO REQUESTS GILBOA___3 OUT OF MERIT NOT SCHEDULED IN MIS DUE TO PRIOR DERATE AT 11:00 08/23/00
23-Aug-2000 12:08:53 TP-CE REQUESTS GOWANUS_GT 3_GRP NO LONGER OUT OF MERIT. AT 10:38 08/23/00
23-Aug-2000 12:10:33 TP-CE REQUESTS NARROWS_GT1 & GT2_GRPS NO LONGER OUT OF MERIT. AT 11:00 08/23/00
23-Aug-2000 13:13:46 TP-NM REQUESTS ALBANY___2 OUT OF MERIT FOR EMISSIONS TESTING AT 13:00 08/23/00
23-Aug-2000 18:36:26 TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR LOCAL SECURITY. LOAD POCKET AT 18:35 08/23/00
23-Aug-2000 18:44:11 TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR LOCAL SECURITY. AT 18:45 08/23/00
23-Aug-2000 20:26:20 TP-LI REQUESTS EAST_HAMPTON___DIESEL NO LONGER OUT OF MERIT. AT 20:20 08/23/00
23-Aug-2000 22:37:50 PJM initiated curtailment cut 150 MWs
23-Aug-2000 22:52:05 TP-CH REQUESTS NEVERSINK___HYD OUT OF MERIT RIVER WATER LEVELS AT 22:30 08/23/00
23-Aug-2000 23:38:39 TP-CE REQUESTS ASTORIA___3 NO LONGER OUT OF MERIT. AT 23:38 08/23/00
23-Aug-2000 23:58:12 TP-NM REQUESTS ALBANY___2 NO LONGER OUT OF MERIT. AT 23:58 08/23/00
Back to top

Committed for Reliability

Insert Time Message
23-Aug-2000 13:47:07 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/23/2000 23 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:08 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 00 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:09 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 01 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:11 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 02 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:12 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 03 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:13 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 04 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:14 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 05 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:15 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 06 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:16 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 07 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:17 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 08 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:18 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 09 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:19 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 10 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:20 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 11 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:21 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 12 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:22 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 13 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:23 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 14 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:24 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 15 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:26 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 16 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 13:47:27 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 17 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:02:52 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 02 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:02:53 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 03 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:02:54 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 04 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:02:55 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 05 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:02:56 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 06 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:02:57 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 07 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:02:58 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 08 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:00 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 09 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:01 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 10 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:02 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 11 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:03 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 12 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:04 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 13 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:05 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 14 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:06 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 15 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:07 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 16 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:08 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 17 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:09 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 18 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:10 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 19 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:11 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 20 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:12 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 21 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:13 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 22 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 16:03:14 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 08/24/2000 23 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 17:04:40 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 18 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 17:04:41 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 19 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 17:04:42 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 20 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 17:04:43 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 21 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 17:04:44 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 22 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
23-Aug-2000 17:04:45 Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/24/2000 23 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
Back to top

Market Monitor Notices

Insert Time Message
23-Aug-2000 11:32:57 The Real Time prices have been updated in the MIS for 08/19/2000 in hours (22,)
23-Aug-2000 11:58:44 Notice:
The Average Real Time prices have been updated in the MIS for 08/19/2000 in hours (22,)
23-Aug-2000 14:58:00 The Real Time prices have been updated in the MIS for 08/20/2000 in hours (17,)
23-Aug-2000 15:50:54 Notice:
The Average Real Time prices have been updated in the MIS for 08/20/2000 in hours (17,)
23-Aug-2000 16:36:28 The NYISO is reserving hours 0900 through 1700 and 2000 in the 22 August 2000 Real-Time Market to verify prices.

Prices in the Day-Ahead Market for 23 August 2000 are correct.