| Time Stamp | Time Zone | Limiting Facility | Facility PTID | Contingency | Constraint Cost ($) |
| 09/29/2024 08:00 | EDT | SCH - NE - NY | 23318 | BASE CASE | -0.13 |
| 09/29/2024 00:00 | EDT | ASTORIAW 138 HELLGATE 138 1 | 25210 | BASE CASE | 0.02 |
| 09/29/2024 11:00 | EDT | SCH - NPX_1385 | 325277 | BASE CASE | 0.93 |
| 09/29/2024 11:00 | EDT | SPRNBRK 345 EGRDNCTR 345 1 | 25105 | NEPTUNE HVDC TIE LINE | 4.17 |
| 09/29/2024 12:00 | EDT | SPRNBRK 345 EGRDNCTR 345 1 | 25105 | NEPTUNE HVDC TIE LINE | 0.16 |
| 09/29/2024 13:00 | EDT | SPRNBRK 345 EGRDNCTR 345 1 | 25105 | NEPTUNE HVDC TIE LINE | 0.31 |
| 09/29/2024 15:00 | EDT | SPRNBRK 345 EGRDNCTR 345 1 | 25105 | NEPTUNE HVDC TIE LINE | 0.17 |
| 09/29/2024 16:00 | EDT | SPRNBRK 345 EGRDNCTR 345 1 | 25105 | NEPTUNE HVDC TIE LINE | 4.66 |
| 09/29/2024 17:00 | EDT | SPRNBRK 345 EGRDNCTR 345 1 | 25105 | NEPTUNE HVDC TIE LINE | 0.43 |
| 09/29/2024 20:00 | EDT | SPRNBRK 345 EGRDNCTR 345 1 | 25105 | NEPTUNE HVDC TIE LINE | 1.14 |
| 09/29/2024 21:00 | EDT | SPRNBRK 345 EGRDNCTR 345 1 | 25105 | NEPTUNE HVDC TIE LINE | 5.46 |
| 09/29/2024 19:00 | EDT | DEPOSIT 69 INDIANHD 69 1 | 325971 | TWR:HOLBROOK 880 & 882 | 6.99 |